Archer Co. MUD Expansion

Expansion of the Archer County Municipal Utility District (M.U.D.) water system utilizing a Water Fund loan.

This project included major improvements to increase the capacity of the Archer County M.U.D.  CPB provided professional engineering services including the design and construction a 100,000 gallon elevated storage tank, a 125,000 gallon ground storage tank, and a new main pump station.  Services also included converting an existing standpipe to a ground storage tank and creating an upper pressure plane with a new pump station.  CPB also provided design of the electrical and control system.  The total construction cost for the project was approximately $950,000.   

Client and/or Owner/Operator

Larry Hardin

Chairman

Archer Country M.U.D.

15198 FM 1954

Wichita Falls, TX 76310

940-691-0834

Previous
Previous

City of Saint Jo:

Next
Next

Olney WTP Rehabilitation