Jasper WTP Clearwell Construction

New 5MG Clearwell at the Jasper Water Treatment Plant in Wichita Falls, Texas.

This project included major improvements to the Jasper Water Treatment Plant. CPB provided professional engineering services including the design and construction of a new 5MG clearwell and baffling, retrofitting an existing 5MG clearwell with baffling, design and construction of 2 valve vaults, and concrete coating of existing structures. Other services included utility relocations, cost analyses and budget preparation, and project management. Construction was completed in 2008 and the total construction cost for the project was approximately $3.6 million.

CPB has a long history and a good working relationship with the City of Wichita Falls. CPB has proved its ability to provide complete civil engineering, project management, and surveying services through multiple collaborations with the City at the Jasper WTP as well as other projects.

Client and/or Owner/Operator

City of Wichita Falls

Mark Southard

Utility Operations Director

4801 Big Ed Neal Drive

Wichita Falls, Texas 76307

(940) 691-1153